Popsicle Bridge

Event Id : 458

Event Name : Popsicle Bridge

Event Brief :

Participants are required to construct a bridge using popsicle sticks provided by the event coordinator on the day of the event, designed to safely carry the maximum possible load while adhering to the given constraints. No material cost will be borne by the participants. Judging is based on strength, efficiency, design, and aesthetics. Team size: 2–4 students Materials Allowed: ✔ Popsicle / Ice-cream sticks (standard size only) ✔ Adhesive: Fevicol / Wood glue (preferred) Bridge Specifications (Recommended): Span length: 60 cm Maximum width: 10–12 cm Maximum height: 15–20 cm Bridge must be self-supporting Construction Rules: Bridge must be constructed on-spot. No pre-fabricated joints allowed. Bridge must be one single unit (no detachable parts). Only glue joints allowed. Loading & Testing Rules: Load will be applied gradually at the center of the span. Loading method: Bucket with sand / weights Loading stops when: Bridge collapses Excessive deformation occurs Organizer decides structure has failed

Event Coordinator :

Prof. Jay Kalaria

Student Coordinator :

Hemang Mori and Vijay Odedara

Event Date and Time :

Date: 4th & 5th February

Time: 10:30 am to 2 pm

Location :

MB002

Rules / Guidelines / Judging Criteria For Popsicle Bridge

- Judging Criteria :

Judging Criteria:

Maximum Load Carried (Primary – 70%)
Higher load = higher score

Structural Efficiency (20%)
Efficiency = Maximum Load (kg) / Weight of Bridge (kg)

Rule Compliance & Presentation (10%)
Proper dimensions
Explanation by team

Tie-Breaker Rules:
Higher efficiency
Lower bridge weight

Disqualification Criteria:
Use of prohibited materials
Dimensions exceeding limits
Unsafe behavior during testing
External support during loading

- Entry Rules & Guidelines :

Participants are required to construct a bridge using popsicle sticks provided by the event coordinator on the day of the event, designed to safely carry the maximum possible load while adhering to the given constraints. 

No material cost will be borne by the participants.

Judging is based on strength, efficiency, design, and aesthetics.
Team size: 2–4 students

Materials Allowed:
✔ Popsicle / Ice-cream sticks (standard size only)
✔ Adhesive:
Fevicol / Wood glue (preferred)

Bridge Specifications (Recommended):
Span length: 60 cm
Maximum width: 10–12 cm
Maximum height: 15–20 cm
Bridge must be self-supporting

Construction Rules:
Bridge must be constructed on-spot.
No pre-fabricated joints allowed.
Bridge must be one single unit (no detachable parts).
Only glue joints allowed.

Loading & Testing Rules:
Load will be applied gradually at the center of the span.

Loading method:
Bucket with sand / weights

Loading stops when:
Bridge collapses
Excessive deformation occurs
Organizer decides structure has failed

Judging Criteria:

Maximum Load Carried (Primary – 70%)
Higher load = higher score

Structural Efficiency (20%)
Efficiency = Maximum Load (kg) / Weight of Bridge (kg)

Rule Compliance & Presentation (10%)
Proper dimensions
Explanation by team

Tie-Breaker Rules:
Higher efficiency
Lower bridge weight

Disqualification Criteria:
Use of prohibited materials
Dimensions exceeding limits
Unsafe behavior during testing
External support during loading

Winners

1st = Winner and 2nd = Runner Up as per the marking system.

© Copyright - 2026. All Rights Reserved. Marwadi University.